Brochure Download

Case Studies

RSS feed for this section
Key clamps and galvanised pipes holding clothing

A Good Fit for Harper & Lewis

As the number of applications for key clamps and galvanised steel tube continues to increase, Fisher Alvin Group boast a large number of customers who are interior designers and shop fitters. They all find the key clamp range particularly versatile in designing solutions for clothes shops. Amongst these, we have been proud to support the… more »

key clamps hand rail for wheelchair ramp

Handrail for Wheelchair Access Ramp

At Fisher Alvin Group our aim is to provide a quality solution every time. This is evidenced in one of our latest projects when we were approached by Ormiston Chadwick Academy. The school were looking to put on a school play and needed to install a ramp to the side of the stage to enable… more »

Key clamp versatility providing support for sports netting

Key Clamp Cricket Nets

With the frosty mornings almost behind us for another year and attention starting to switch to our summer sports, Fisher Alvin continues its ongoing relationship with Cricket Ground Equipment Ltd. Key Clamps and galvanised steel tube are extremely versatile and as a result offer a wide range of uses. This is brought to life here… more »

Work safety hand rails providing safe walking area

Handrails for Folcrete

Following an approach by Folcrete Restoration Services, we’ve been able to provide another quality key clamp solution. The end user was a blue chip company who take the health and safety of their customers and staff very seriously. When it was identified that both were being exposed to an unnecessary risk as they walked from… more »

Key clamps galvanised steel roof protection on a sunny day

Roof Edge Protection for DS Group

With the crane ready and the installers on site, the Fisher Alvin Freestanding Roof Edge Protection arrived on time at 7am Saturday morning, picked, packed and ready to be transferred onto the roof area and to be installed. Over the course of the next two days over 193 metres of Freestanding Roof Edge Protection was… more »