Opens in a new tab
Fisher AlvinFisher Drinkers ↗Supplying galvanised steel since 1912
Tel: 01905 779944Get a quote
Quote within one hour
Next-day delivery on stock orders
Free design service

Key Clamp RK-A10 Wall Termination Brackets

RK-A10 wall termination brackets: a pair of A10 wall flanges for a key clamp handrail kit run that ends on a wall, in 42.4mm (size 7) or 48.3mm (size 8). Hot-dip galvanised four holed plates give a rigid fixing.

POA
View Size Chart

Quote Within One Hour

In working hours. Next-day delivery on stock orders.

Not sure it is the right part? and we will check it for you.

Key Clamp RK-A10 Wall Termination Brackets: pair of A10 wall termination brackets for Fisher Alvin key clamp handrail kits, for a run that ends on a wall. Each A10 wall flange is a four holed plate giving a rigid fixing for handrail that terminates on a wall.

For a single fitting, see the A10 wall flange, made in sizes 5 to 9.

Key Clamp RK-A10 Wall Termination Brackets Sizes

SizeTube outside diameterSupplied as
Size 742.4mmPair of A10 wall flanges
Size 848.3mmPair of A10 wall flanges

Kits give a finished handrail height of 1100mm with uprights at 1300mm centres. The A10 is not a structural fixing for supporting a vertical guardrail post: use the A12 base plate for that.

Features

  • Ends on a wall. Finishes the rail neatly where the run meets a wall.
  • Rigid fixing. A four holed plate on each bracket.
  • Supplied as a pair. Two A10 wall flanges in one listing.
  • Bolt down, no welding. You bolt the kit down and tighten the fittings with a hexagon key. No welding or hot works.
  • Modular. A damaged section can be replaced on its own, unlike a fabricated rail.
  • Extend later. Kits use the same key clamp fittings and galvanised tube we sell loose, so you can extend or alter the run with standard parts.
  • Galvanised. Hot-dip galvanised as standard. Powder coating is available: ask at quote stage.

Standards and Testing

Fittings are malleable iron castings, manufactured in excess of BS 6681 (ISO 5922) and BS 2789 (ISO 1083), with Dacromat coated, case hardened set screws. Fittings and tube are hot-dip galvanised to BS EN ISO 1461. The design load for your site and the finished handrail must be checked by whoever signs it off.

Often Used With

Build the run from the other kit sections: RK-RMS mid section, RK-RES end section, RK-RDS end D section, RK-R90 90 degree corner and RK-HRP horizontal rail pair. Add an A11 kick plate base plate on roofs and mezzanines, and close an access opening with a self-closing gate, which closes automatically behind the user.

Order and Quote

Measure the run and note the ends, corners and any point where the rail meets a wall. Choose size 7 or size 8, add the sections to your quote and tell us the surface you are bolting to. Not sure which pieces you need? Send us the layout and we will list them. Any extra tube is cut to length free. Stock orders go out for next-day delivery, and we reply to quotes within one hour in working hours.

See the full key clamp handrail kits range and our buyer guide.

Size

,

Part of the range

Key Clamp Handrail Kits

See every product in the range and the buyer guide, or send us the job and we quote within one hour.

Size Chart

#Ø (mm)ABCDE
742.48554112116
848.38554112116
✕

Get a quote within one hour

Tell us what you need: products, quantities, lengths or a sketch. We reply within one hour in working hours. Prefer to talk? Call 01905 779944.

Supplying since 1912
Quote within 1 hour
Tube cut to length free
Free design service
Next-day delivery on stock orders